Skip to main content
shieldCompliance Intelligence Guide

VERIFIED ANSWERS

SPEC-NAV understands the technical context of your question and backs every answer with the official source — section, page, and citation.

description

How SPEC-NAV Finds Answers

Built to get it right, not just get it fast

psychologyUnderstands Context

Search for “minimum clearance” and SPEC-NAV also considers “separation distance” and “offset requirements” — connecting related ideas that keyword search misses entirely.

blockSource Verification

Every claim is validated against the source evidence. If the standard doesn't address your question, SPEC-NAV tells you explicitly instead of giving you a fabricated answer.


search

Query Like a Professional

Speak to it like a colleague. Type or voice

Instead of…Ask this…
ConcreteWhat are the compressive strength requirements for structural concrete?
SterilizationWhat are the temperature and hold time requirements for steam sterilization?
RunwayShow me shoulder width requirements for runways serving Group IV aircraft.
EmissionsWhat monitoring frequency is required for NOx emissions above 100 tons per year?

tips_and_updates

Pro Tips

Reduce risk further

micVoice Search

Tap the microphone and speak your query naturally. Works on desktop Chrome and Android.

filter_altSource Filtering

Narrow results to specific documents. Select one or multiple standards to focus your search scope.

content_copyCopy for Report

Copy any answer with source citations, formatted and ready for emails, reports, or RFIs.

open_in_newVerify in Source

Every result links to the official published source. Click to verify at the referenced section.


mic

Voice-Powered Field Narrative

Dictate your observations. AI writes the narrative.

In the field you don't have time to type. Tap record, speak your raw observations, and your AI assistant converts them into a polished, professional field narrative for the PDF. Speak it once, review it once, download it.

Field Notes & AI Summary
2-Step Workflow
1
Internal Field NotesNot on PDF

Type or speak your raw observations. Stays internal — never appears on the exported report.

got to site around 7, Harris crew setting up, 8 guys...

Tap to record voice notes

Words appear in real-time · auto-stops after 8s silence

2
Daily Field NarrativePending

Your assistant reads your Step 1 notes and writes a professional summary here. This exact text appears on the certified PDF report.

Your professional summary will appear here after clicking Generate above...

summarize

See It in Action

A complete daily report — created in under 2 minutes.

Log your day — weather, work performed, equipment, labor, and field observations — all in one form. Dictate your notes by voice and let AI write the professional narrative. Review and download a certified PDF before you leave the site.

SR-91 Corridor Improvement

#CT-2025-0847
Apr 29, 2026
person

M. Torres

· Inspector
Draft
Schedule2 / 7
eventSchedule & Weather

Time Arrived

06:45

Time Departed

16:30

Weather Conditions

cloud_doneAuto-filled

sky

Clear

temp

72°F

wind

SW 8 mph

precip

None

add_circleCreate Your First Report — Free

No credit card required · 3 free reports included


forum

Search Your Project History

AI finds answers across every report and provision you've logged.

Type a natural question and AI searches across every daily report and uploaded special provision in your project. Verify compliance, look up past work, or trace who was on site — with the exact source, date, and section.

SpecNav AI

Project Intelligence

Does today's compaction method meet our uploaded special provision?
Based on Special Provision Section 3.4.2, breakdown compaction requires 3 coverages with a vibratory roller — which matches today's logged work. ✅
SP Section 3.4.2Apr 17 Report
Who was the foreman on site last Tuesday?
From the daily report on Tuesday Apr 8: Foreman was Mike Harris, with a crew of 5. Work started at 07:15.
Apr 8 Report
Were there any weather delays this month?
Yes — 2 weather delays logged this month. Apr 3 (rain, 3hr delay) and Apr 11 (high winds, work suspended 10:00–13:30).
Apr 3 ReportApr 11 Report
Ask anything about this project...

Responses are drawn from your uploaded daily reports and special provisions. Always verify critical information against the original source.


warningAccuracy & Disclaimer

Disclaimer: This application provides informational access to publicly available standards and reference materials. AI-generated summaries are approximate. Always consult the original issuing agency's published documents for authoritative requirements.

Page References: Page numbers refer to PDF viewer positioning and may differ from printed page numbers.

contact_supportSupport

Need a specific standard indexed? Our team continuously adds new documents. Let us know what you need.

Contact Supportarrow_forward